You don't have javascript enabled. Good luck with that.
Pencarian
transjakarta terbelah tmc polda metro jaya
transjakarta terbelah tmc polda metro jaya .
photo istimewa - Beritajakarta.id

An Articulated TransJakarta Bus Detached on Jalan Raya Bekasi

An articulated TransJakarta bus in corridor XI (Kampung Melayu-Pulogebang), was having broken bolts on Jalan Raya Bekasi Timur, Jatinegara, East Jakarta, Thursday (8/8), around 3 PM. As a result, the bus with body number DMR 005 and license plate number B 7308 IV got its front part detached from rear part.

The bolts were broken into pieces one by one until the bus detached from the connection. I don’t know why it could happen

When this incident happened, the bus was transporting 40 passengers from Kampung Melayu Terminal towards Pulogebang. But when it got on Jalan Raya Bekasi Timur, 10 big bolts were suddenly broken which led to detachment.

“The bolts were broken into pieces one by one until the bus detached from the connection. I don’t know why it could happen,” said Himawan (48), the bus driver.

Trespassing Red Light, Kopami Hit by TransJakarta Bus

About 40 passengers in the bus had panicked when this incident happened. Luckily, the bus was already stopped, so they could go off the bus safely one by one.

According to Himawan, the bus has gone through routine maintenance in TransJakarta bus pool. In fact, the bus was just checked this morning by the mechanics.

At this time, technicians have arrived in the location and are currently repairing the damages. To prevent the traffic around Jatinegara Station from getting disturbed, the bus has been pulled over to Prumpung or Jalan DI Panjaitan.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye350 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik